Trump's Middle Corridor Plans Face Russian and Iranian Roadblocks

Argentina Takes Falklands Oil Fight to International Tribunal Eurasianet is an independent news organization that covers news from and about the South Caucasus and Central Asia, providing on-the-ground reporting and critical perspectives on… More than a year has passed since Armenia and Azerbaijan signed the Washington agreement under the direct mediation of President Trump.
Nevertheless, the TRIPP project, an approximately 40-kilometer route that would constitute the shortest segment of the Middle Corridor, has yet to be implemented, leaving the broader project incomplete.
Notably, the principal obstacles to its implementation originate neither in Armenia nor Azerbaijan but are predominantly external factors that continue to impede the project’s realization.

In August 2025, the Trump administration initiated a process aimed at normalizing relations between Armenia and Azerbaijan, in which an enhanced U.S.
strategic presence in the South Caucasus, particularly in Armenia, was expected to play a significant role.
A central element was the proposed Trump Route for International Peace and Prosperity (TRIPP) on Armenian territory, which would provide Azerbaijan with a direct connection to its Nakhchivan exclave without transiting Iran.
The TRIPP would also offer Armenia and Azerbaijan an opportunity to strengthen their integration into the Middle Corridor, connecting Central Asia with Europe via the Caspian Sea, the South Caucasus, and Turkey.
In other words, the TRIPP would facilitate the development of the Middle Corridor through Armenia and Azerbaijan, which, according to the Trump administration, would contribute significantly to the normalization of Armenian-Azerbaijani relations.
From a strategic perspective, the route also offers the prospect of transporting Central Asian energy resources to Europe while bypassing Russia and Iran.
At the same time, it would provide Central Asian states with greater opportunities to diversify their export routes and reduce their dependence on China.
Kazakhstan has shown particular interest in the project, as reflected in its deepening relations with Armenia, alongside its traditionally close ties with Azerbaijan.
Nevertheless, the project has experienced significant delays despite sustained efforts by Washington to advance its implementation.
| Product | Price | Change |
|---|---|---|
| Brent Crude | $102.14/bbl | +0.34% |
| WTI Crude | $96.90/bbl | +0.21% |
| EN590 Diesel | $846/MT | +0.18% |
| Jet Fuel A-1 | $1090/MT | +0.55% |
| Mazut M100 | $450/MT | -0.15% |
| Bitumen 60/70 | $470/MT | +0.08% |
| Sulphur Gran 99.5% | $470/MT | -0.44% |
| Urea 46% Gran | $650/MT | +1.12% |
| NPK 16-16-16 | $460/MT | -0.28% |
| Nat Gas TTF | $15.42/MMBtu | +0.92% |



Comments
Post a Comment